Another project in the last few weeks was the delivery and installation of two KBA RA105-5Pro & RA105-4Pro presses at a customer in NRW. In total, 6 articulated trucks had to be unloaded over 2 days, the machine parts unpacked and successively brought in. Both machines were delivered on time, so that the ZBV Fels could start with your application and for the respective truck - as well as the assembly team no idle times arose.
Not only the low ceiling height but also the recently renewed industrial floor presented a further challenge. The machines had to be brought in packed on pallets, as suspended transport was not possible due to the tightly dimensioned entrance door. Our special forklift "Büffel" was used for unloading and bringing in the machines. Due to its gas drive and compact design, this truck is ideally suited for driving into narrow or enclosed spaces. Thanks to years of experience, the processes were quickly coordinated and the team brought in part by part. The printing units were then lifted off the crate bases, placed and subsequently aligned only at the staging area.